MWH Constructors, Inc. cordially invites up to 2 members of your firm to attend a Prime Contractor/Subcontractor Networking Happy Hour to facilitate introductions, conversation, and teaming opportunities between City of Austin Certified Minority and Women-Owned Contractors and Prime Contractors who have expressed interest in pursuing any of the following 7 packages included in GMP 7 for the City of Austin Walnut Creek Wastewater Treatment Plant Expansion Project. (Space is limited and will be on a first-come, first-served basis) · S700.A BioP/Aeration Basins/Final Clarifiers-Site Structures, Architectural, and Process Equipment; Estimated Construction Cost: $150,000,000. Scope consists of: all CSI divisions (less 16 and 17), structural shell and architectural interior, sub grade preparation for SOG, concrete, underground piping, mechanical process equipment installation and CSU. · S700.B UV/HW2-Site Structures, Architectural, and Process Equipment; Estimated Construction Cost: $40,000,000. Scope consists of: all CSI divisions (less 16 and 17), structural shell and architectural interior, sub grade preparation for SOG, concrete, underground piping, mechanical process equipment installation and CSU. · S700.C Filters/Sludge-Site Structures, Architectural, and Process Equipment; Estimated Construction Cost: $30,000,000. Scope consists of: all CSI divisions (less 16 and 17), structural shell and architectural interior, sub grade preparation for SOG, concrete, underground piping, mechanical process equipment installation and CSU. · S702 Raw Sewage Siphons, Estimated Construction Cost: $19,500,000. Scope consists of: Excavation, demolition, underground wet utilities, concrete, slide gates, miscellaneous metals. · S713 Maintenance Building, Estimated Construction Cost: $4,500,000. Scope consists of: All CSI divisions (less 16 and 17), concrete, structural shell, architectural interior. · S716 Existing Plant Electrical/I&C, Estimated Construction Cost: $60,750,000. Scope consists of: Electrical duct bank, electrical gear, conduit, wiring, and I&C devices. · S720 Sitewide Hardscape, Sitewide Landscape and Fencing, Estimated Construction Cost: $4,585,000. Scope consists of: Fencing, landscaping, hydroseeding, paving, bollards, perimeter works.
Want to earn money sharing events? Become a promoter